Choose language


Choose region

81 Headerpic D A U G A V A Full I N D I C A T I V E
Webinar Recording June 2024

Combined Bridge over the Daugava River

Stefan Nübler, Project Manager at LAP, and Roberto Alía Cuadrado, BIM Specialist at LAP and responsible for this project, will talk about the most challenging aspects and solutions by using the SOFiSTiK Bridge + Infrastructure Modeler (SBIM) throughout the design of this bridge.


With a total length of 1150 m the Combined Bridge over the Daugava River near to the city of Riga, Latvia, will be one of the key components of the European Rail Baltica project. Within the project, BIM based planning was requested during all design stages. Thanks to the SOFiSTiK Bridge + Infrastructure Modeler, this could be fulfilled following a parametric approach in safe, fast and traceable way.

The use of variables for dimensional and non-dimensional purposes, the use of cross member tool briefly speaking about local station configuration, and data workflows between SBIM and Excel using Dynamo will be the main topics in this presentation.

Webinar Recording

The recording will be available soon. Please come back later to watch the recording.

This webinar is presented to you by:

Roberto Alia Cuadrado

Roberto Alía Cuadrado
BIM Specialist for Daugava Bridge

Leonhardt Follow on LinkedIn
Stefan Nuebler

Stefan Nübler
Project Manager at LAP

Leonhardt Follow on LinkedIn
Martin Siffling

Dr. Ing. Martin Siffling
Head of Customer Service / Construction

Sofistik Follow on LinkedIn