Choose language


Choose region

Hetzel Bridge
Bnei Barak, Israel

Client

Ayalon Highways Co. Ltd

Contractor

Terre-Armee

Hetzel Bridge is part of the Herling Bridges project, a complex of three bridges located in Bnei Barak, Israel, with a total area of 30,000 m2.
The first stage of the project includes Hetzel Bridge with a bridge area spanning 10,750 m2. The technology deployed is cast-in-place post tensioning
prestressing deck slab with a deck slab thickness of 125 cm.

 

Tendon modeling was made using SOFiSTiK's TEDDY for transverse prestressing and the graphic interface for longitudinal prestressing, while the
construction stages analysis was conducted using SOFiSTiK's CSM task (= “Construction Stage Manager”).