Two Span Girder - Construction Stages

A 60 m long girder which is fixed at both ends is assembled from two precast parts by using an auxiliary support. The loading consists of the dead weight only. The auxiliary support is removed after establishing a monolithic connection.You will find the input data file viaTEDDY > help > examples... > ase > english > ase6_two_span_girder_construction_stages.datLevel of difficulty: beginners

Type Example from Practice
Productgroup Structural / Dynamics / FEA
Topics CADINP Input
Applications Building Design
Date 27.11.2008
Keywords construction stages, construction phases, compound, SOFiSTiK example