Internal Force Redistribution Due to Creep

A step-by-step constructed two-span girder with different creep coefficients of the two spans is examined.The following stages are considered:  - construction stage 1  - construction stage 2  - single-castingstage (This is the case, if the structure is constructed monolithically in one stage.)  - creep of the immediate restraintYou will find the input data file viaTEDDY > help > examples... > ase > english > ase7_creep_two_span_girder.datThis example is documented in detail at the ASE manual - chapter 5.7Level of difficulty: advanced

Type Example from Practice
Productgroup Structural / Dynamics / FEA
Topics System + Loads
CADINP Input
Loads / Actions
Analysis: Construction Stages
Applications Building Design
Keywords creep, construction stages, construction phases, restraint, two-span girder, SOFiSTiK example