Excavation with construction stages

This example shows the workflow in Talpa with CSG (Construction Stage ManagerGeotechnics ). Example in German languange only - for translation press CTRL+Q+T in TEDDY.

Version: FEA 2012

 

The system definition should be done with SOFiMSHC now. Please see our examples via Teddy - Help - Examples -> talpa - english - embedded wall.

 

 

Type Example from Practice
Productgroup Structural / Dynamics / FEA
Topics Analysis: Geotechnics
Analysis: Construction Stages
Applications Geotechnical Engineering
Downloads baugru_cs_02.dat
Date 18.06.2011
Keywords construction stages, geotechnics